Open Time:

Mon-Fri: 8AM - 4PM

From Template to Installation: Inside the Custom Countertop Process with J&A Stone Designs

Ever wonder how your countertop goes from a massive slab in a warehouse to a polished centerpiece in your kitchen? At J&A Stone Designs, every custom countertop process begins with precision templating and ends with meticulous installation—crafted for Florida homes that demand both style and endurance.

How a countertop goes from slab to showpiece

Custom fabrication is the secret behind the perfect fit. Off-the-shelf options can’t account for unique cabinet layouts, Florida humidity, or the subtle curves of your walls.
That’s why each project in Polk County begins with an on-site template and a digital layout before cutting even starts.

Step-by-step: our installation process

1. Templating
Our technicians measure every inch of your cabinetry using laser-accurate tools. These measurements form the digital “map” for fabrication. Sinks, cooktops, and backsplashes are noted so cutouts align flawlessly.

2. Fabrication
Back in our Auburndale workshop, slabs are cut using CNC machines. Edges are profiled—eased, ogee, bevel, or miter—and polished to your chosen finish. Each piece is dry-fitted before transport.

3. Sealing & delivery
Natural stones like granite and marble are sealed in-shop to protect against moisture. Quartz generally requires no sealing but still undergoes inspection and cleaning.

4. Installation day
Installers remove old counters (if needed), secure the new tops with adhesives, align seams, and reconnect sinks after curing. Expect a few hours of focused work and a dramatic transformation.

How homeowners can prepare for installation day

A little preparation ensures a smooth experience:
• Clear countertop surfaces and base cabinets.
• Unplug small appliances and clear entry paths.
• Confirm plumbing and electrical fixtures are ready for reconnection.
• Keep pets and children out of work areas for safety.

Timeline: what affects turnaround time

Most projects run about 7–14 days from template to installation. Factors that can extend this include:

  • Material choice – exotic stones may take longer to source.
  • Edge complexity – detailed profiles add fabrication time.
  • Sink or backsplash details – custom cutouts and backsplashes require extra polishing.
  • Weather – Florida humidity can slow adhesive curing, so we plan installations for ideal conditions.

Aftercare and inspection

Once installation is complete, adhesives and silicone seams need a day to set. Wait 24 hours before reconnecting plumbing or placing heavy appliances.
Use mild soap and water or a stone-safe cleaner. Avoid harsh chemicals during the first week. Granite and marble should be resealed annually for best protection.

FAQs

Do I need to remove old countertops before templating?
No—keep them in place until installation day so measurements remain precise.

How long does the process take?
Typically two weeks from templating to final install, depending on your material and schedule.

Can humidity affect installation?
Yes. Our team adjusts curing times and ventilation to Florida’s climate.

When can I use my new countertop?
After 24 hours, once adhesives and sealants fully cure.

What should I do before installers arrive?
Clear access paths and disconnect small appliances to keep the work zone safe.

Why Choose J&A Stone Designs

  • Local showroom with expert design guidance
  • Full-service templating, fabrication, and installation
  • Options for quartz, granite, marble, and custom cabinetry

Core Services

  1. Quartz Countertop Installation
  2. Granite Countertop Installation
  3. Custom Cabinetry

Contact us today!
Visit our Auburndale showroom or request your free quote online.

You might also enjoy